  • Toric Engineering is a strategic outsourced partner for the design/build, installation, and maintenance of water, waste water, and gas distribution control panels. Explore our recent projects for clients through-out Indiana and the Midwest.

  • Osgood Gas Monitoring

    The Osgood Gas Utilities used analog pressure gauges to measure the gas pressure at the substations.  The substations were checked once a day manually which meant that a gas leak could occur and go almost 24 hours before being reported.Challenges Osgood Gas Utilities needed a way to [...]

    Read more

    Cummins Flood Risk Reduction

    The scope of the flood risk reduction project was to manage both stormwater runoff and water table level to prevent flooding of the Cummins Technical Center and associated buildings. During previous rain events, significant damage had occurred to buildings and equipment. Challenges The project [...]

    Read more

    Waste Management SCADA

    The Waste Management Liberty Landfill consists of seven leachate (combination of gas and water) and four water pumping stations.  The pump stations pumped the leachate and water back to an effluent tank that was emptied into a truck.  The stations were run off a starter that would turn off[...]

    Read more

    Kokomo Blower VFD Upgrade

    The scope of the blower VFD upgrade was to replace obsolete reduced-voltage starters with new variable frequency drives (VFD).  With the existing starter circuit, the blowers were run at full speed and the air volume was controlled with inlet dampers on each blower.  The VFD replacement [...]

    Read more

    Fall Creek Filter Controls Upgrade

    The Fall Creek Filter was a design-build project with Citizens Energy and Bowen Engineering. The scope of this project was to rehab controls for 12 filters. The existing control panels had become obsolete and needed to be replaced.  Challenges The filter control panels had been modified [...]

    Read more

    Newburgh WWTP Improvements

    The Newburgh Waste Water Treatment Plant Improvements project was done with Reynolds Inc.  The existing Newburgh WWTP consisted of five Sequence Batch Reactor (SBR) tanks that were designed to handle 14.4mgd.  With the improvements project, an additional three SBR tanks were added to the [...]

    Read more

    Tipton SCADA Project

    The City of Tipton SCADA project was a fast-paced project. Toric had 120 days to design, build panels, and install SCADA systems for Water and Waste Water. The requirements of this project were to monitor and remotely control the West Water Treatment Plant and West Waste Water Treatment Plant. The [...]

    Read more